School renovation
Renovation project of Shler school in Penjwen started on (2023/10/13) which had 19 rooms, 12 classrooms, 4 administration rooms, 1 treasury room, 1 guard room and 1 tea house. We did our work as follows. 1- Because this school was not suitable for education, it was turned into the treasury of Penjwen Education Directorate. 2- Removing the iron windows of all rooms (each room had 2 windows). Removing the iron windows and doors of the toilets, breaking the concrete floor and removing the water pipes and sewers completely. 3- Lowering the window walls of the rooms by about 60 cm because the rooms were not visible from the outside. The walls were stone and about 50 cm wide. Plastering the walls of windows and doors, replacing all iron windows with plastic windows, as well as plastering the walls of classrooms and corridors of the school. 4- Installation of water and sewerage pipes for all toilets and roof sewers and where necessary to remove sewage to the box sewer, such as tiling the floor in the toilets and their corridors, installing plastic doors for or, installing hot and cold faucets Installation of fresh water tanks, connection of main water and wells, and installation of water installations where necessary. 5- Washing, cleaning and painting all the walls of the rooms, corridors, exterior walls and courtyard walls. 6- Installing doors for all classrooms, guard rooms, treasury, two tearooms for students to enter and two tearooms for going up to the second floor. 7- Removing plates, switches, bad plates, wires, pots and bases of all light bulbs, replacement of plates, switches, plates, wires, bases of light bulbs, lights, pots and boxes, installing boards and pulling electricity into the board. 8- Repairing the school yard and concreting the surroundings of the building, the yard path and the garden, which required 75 square meters of concrete. 9- Walling the necessary places in the yard and separating the backyard from the school and installing doors, and raising part of the outside wall of the yard and plastering it. 10- Construction of courtyard doors for the school and school signs, and installing glass for all windows and tearooms and several layers of glass for the upper floor, insulation where necessary. 11- There are several rooms in the back of the school where the employees of the treasury of Penjwen Education Directorate are located because the upper floor is the treasury of education Repairing part of their electricity, painting the corridor, demolishing the wall of the yard, rebuilding, plastering, painting, building doors and concreting the yard for them. Project Cost Amount 53,345,000 Fifty-three million three hundred and forty-five thousand dinars - For the academic year 2023 to 2024, Sekwani Evening School benefited from it Some of the summer 2024 work has been completed.